Uva Asby Scar
- Route
- 3,200 m · 11 kV
- Ground
- Open fell, agricultural land
- Cover
- 1,100 mm to cable
- Scope
- Excavation, cable lay, backfill, reinstatement, jointing support
- Status
- Complete, energised



Clyde Network Testing installs, repairs and proves the underground networks that carry data and power. Twenty directly employed people, our own plant, and a SafeContractor-assessed safety system behind every job, from the first cut to the final splice.
Every line below is assessed and listed on our SafeContractor schedule, so a procurement team can check scope on the SSIP portal before we've sent a compliance pack. Open any line to see what it covers and what it looks like on site.
The "testing" in the name. Fusion splicing, closure build and tray management, then OTDR and power-meter proving so the circuit is handed over with results, not promises.

Underground and overhead telecommunication cabling: duct and sub-duct installation, cable pulling, fault location and repair on live networks, to the operator's specification.

High voltage overlay and the civils that go with it, delivered through tier-one contractors on distribution network programmes. One crew takes the scheme from first cut to live circuit: excavation to energisation.

Trenching, excavation, duct and pipe laying, backfill and reinstatement, with underground services located, exposed and protected before the bucket goes in.

Chambers, bases, plinths and structural concrete groundworks, formed, poured and finished for telecoms and power infrastructure.

Chamber and confined space entry by trained teams under permit-controlled working, with gas monitoring and rescue arrangements in place before anyone goes below ground.

On HV overlay schemes we don't hand the trench to someone else. The crew that breaks ground lays the duct, backfills, reinstates and stays until the circuit is live, so there is one accountable party for the whole route.

HV cable routes across Cumbria delivered excavation to energisation as delivery partner to Alyntra Group, plus fibre and duct works for the telecoms side of the business. All our own photographs, taken by the crews doing the work.










Closure builds, splicing and power-meter proving on live fibre networks, with our own plant and traffic management on site.









Safety is managed, documented and audited. Competent advice comes from a retained external health and safety consultancy, day-to-day compliance runs on UtiliGuard, and the whole system is assessed each year by a UKAS-accredited SSIP member scheme.
Signed, dated and reviewed. The current issue covers asbestos, lifting operations, electricity and our duties as a contractor under CDM 2015.
Excavation, underground services, duct and pipe laying, confined space entry, work at height, highways working and plant.
A training matrix for every operative, with card and certificate expiry tracked and renewals booked before they lapse.
Documented HSEQ site inspections with actions closed out and the record available for client audit.
Site management, RAMS, briefings and workforce competency run on UtiliGuard, so every record is time-stamped, searchable and ready for a client audit without a trip to the van.
Delivered on underground services, excavation safety and task-specific hazards before work starts.
Clear reporting duties and an investigation procedure, with findings fed back into the risk library.
We work as a subcontractor and delivery partner to principal contractors on telecoms and power distribution frameworks, where competency evidence and safe systems of work are checked before the first spade goes in. That suits us.
Location, dates and what needs doing. We'll come back with availability and a price, and the compliance pack if your procurement team wants it first.